Spalling furnace tubes of coker unit succeeded without shutdown of the furnace

Spalling furnace tubes of coker unit succeeded without shutdown of the furnace


On January 17, on-line spalling furnace tubes with steam succeeded in No.3 coker unit, becoming the first unit for spalling tubes without shutdown of furnace among Sinopec refineries.
Currently, the furnace of No.3 coker unit operates stably. The temperature of furnace tube drops 100℃ after each spalling.

Information source: 
2014-12-22